For wholesale distributors · Both sides of the invoice

Invoices in, coded bills out, with the PO attached

Supplier invoices and customer remittances land in the same inbox, and neither gets paid by reading faster. What comes back is a coded draft with the differences already named.

The copper invoice lands at ap@ on the fourteenth, three receiving tickets behind it in the same folder, and a note asking for the PO number because it is thirty days today. By ten, a contractor is on the phone about a short pay on his last order.

Both come into the same mailbox, and the same two people work them, plus the phone, plus the credit holds. Somebody retypes the mill invoice into the system, checks the price by eye, and hunts the PO through a folder of confirmations. Miss a price change and you eat it. Miss a duplicate and you pay twice.

emaillme reads the invoice, sets it against the PO and the receiving tickets, and drafts the reply to the mill. It answers the contractor about his own invoice out of your books too. Your AP clerk approves what agrees and looks only at what does not.

The invoice, with its question

Fictional distributor and customer. Addresses use .example.

From
Halbrook Metals <billing@halbrookmetals.example>
To
Ridgeway Supply <ap@ridgeway-supply.example>
Subject
Invoice 55810, and your PO number

Invoice attached for the copper off the third. It came in three drops, we were short on the two inch.

Your system shows no PO on the order. Send it and we can get this off the statement. Thirty days today.

The two inch went up on the first. That is on the invoice, not on the order.

Attachment: HB-55810.pdf (104 KB)

What went back to the mill

The same thread, answered. Every figure comes from the email and the paperwork behind it.

From
Ridgeway Supply <ap@ridgeway-supply.example>
To
Halbrook Metals <billing@halbrookmetals.example>
Subject
Re: Invoice 55810, and your PO number

The PO is R-7714. Invoice 55810 is checked against it and the three receiving tickets. One line does not agree:

ItemOrderedBilledStatus
1/2 in copper, 50 ft80 coils80 coilsmatches
3/4 in copper, 50 ft40 coils40 coilsmatches
2 in copper, 20 ft12 lengths12 lengthsprice changed
Freight, three dropsincluded$0matches

The two inch is billed at the first of the month price. We ordered on the twenty eighth at the old price and your confirmation came back at that price, so we pay the old one. A revised invoice or a credit clears it the same day.

Everything else agrees, the three drops and the freight included. The PO number is in this reply so your system can pick it up.

On the statement, 55810 is the only one open. It moves the day the price line is settled.

One thing I am not touching: the credit for the pallet damage in September is still not on the account, and that is a call between your AR desk and ours. Nothing here is posted to our books yet.

Ridgeway Supply · ap@ridgeway-supply.example

You're getting this because you wrote to ap@ridgeway-supply.example.

How it works

  1. A mill invoice lands at ap@.

    Often with a question attached: a PO number, a statement line, or a price that moved between the order and the truck.

  2. It goes against the paper you already have.

    The PO, the confirmation, and every receiving ticket, including the drop that came in short.

  3. Price changes get caught at the order date.

    A price that moved after the confirmation is a question for the mill, not a cost you absorb.

  4. The contractor gets his answer out of your books.

    A copy of his invoice, the PO number, whether his credit landed, and why his payment is held.

What gets looked at on an invoice

The three that cost money are a price that moved, a drop that never arrived, and the same invoice sent twice.

  • The PO, the confirmation and the receiving tickets, all of them, before a line is approved.
  • The price on the day the order was confirmed, not the day the invoice was cut.
  • Freight and drop charges against what was quoted, drop by drop.
  • A credit that should have been applied and was not.
  • The same invoice under another number, from the same mill, in the same month.
  • For a customer question, the balance, the open credits and anything on credit hold.

Frequently asked questions

Can it answer a contractor asking for a copy?

It sends the invoice and the statement line out of your accounting system, in the thread he asked in. The numbers come from your books, not from the email.

What if the mill bills a price increase?

The invoice is set against the price at confirmation. If it moved after that, the reply asks for a credit or a revised invoice and names the date of the confirmation.

Does it pay anything?

No. It prepares the match and the reply. Your clerk releases the payment and posts the entry, and that stays with your clerk.

Do we still have to check every invoice?

The ones that agree are checked line by line before you see them, so what reaches your clerk is a short list. The short list is what needs a person.

What about a customer who short pays?

It reads his reason and sets it against the invoice and the return. A real shortage becomes a credit. A mistake becomes a reply with the paperwork attached and the arithmetic shown.

Will it argue with a mill for us?

It drafts the argument, with the order date, the confirmation and the invoice line. A dispute that has been round twice, or an account on stop, goes to your AP desk first.

Related pages

Send a month of ap@

We will set the mill invoices against your POs and draft the answers to the contractor questions in the same batch, so you see both directions on one sheet of paper. A dispute that needs a phone call goes to your desk.

Talk to us about your inbox

A monthly fee per address plus usage, agreed with you. Your customers and suppliers keep emailing the address they already have.