For building supply yards · Contractor POs

Contractor POs, read the way your counter reads them

Four contractor POs before eight, and the counter has not started yet. The typing is what eats the first shift, so the typing is what comes off the desk.

It is 6:20 on a Monday and the pot has not finished pulling. Four contractor POs are already in orders@: a PDF from a builder's office, a photo of a clipboard on a tailgate, a spreadsheet with eighty lines, and one that says same as lot nine, plus twelve sheets of OSB, and expects the counter to remember lot nine.

Your counter can read all four before the gate opens, because it knows the jobs, the builders and what is on the ground at each branch. Reading is not the work. Typing it in is, and in framing season that typing is three hours before the first contractor gets helped. People do not get replaced here, they get buried under it.

emaillme does the typing. Every PO comes back as a draft order: lines matched to what Keeler stocks, branch stock beside each line, the account price on it, delivery or will-call marked. Your counter reads it, fixes what is wrong, releases it.

The clipboard PO, photographed at 6:20

Fictional building supply yard and customer. Addresses use .example.

From
Marisol Vega <purchasing@northgate-framing.example>
To
Keeler Lumber & Supply <orders@keeler-lumber.example>
Subject
PO 4471, Maple Ridge lot 12, Thursday please

Attached is PO 4471 for lot 12. Framing starts Thursday, so we need it on the ground Wednesday afternoon if you can.

Two changes from the copy the office sent. The OSB is 40 sheets and not 30, the framer changed the layout. And put the hangers on the same ticket this time. Last load they came a day late and the crew stood around.

Sending this from the truck, so call the office if the rest is a problem.

Marisol

Attachment: PO-4471.pdf (212 KB)

The draft the counter read

The same thread, answered. Every figure comes from the email and the paperwork behind it.

From
Keeler Lumber & Supply <orders@keeler-lumber.example>
To
Marisol Vega <purchasing@northgate-framing.example>
Subject
Re: PO 4471, Maple Ridge lot 12, Thursday please

Marisol, PO 4471 is drafted for Wednesday afternoon at lot 12. Here is how the lines came out:

Asked forKeeler itemBranch 2 stockNote
2x10 16 SYP, 602x10x16 #2 SYP148 pcscontract price
7/16 OSB, 407/16 OSB sheathing 4x896 sheetsPDF says 30
2x10 hangers, 24LUS210Z joist hanger60same ticket
16d nails, 2 boxes16d framing nail, 50 lb31 boxesquoted price

One line needs your word. The PDF says 30 sheets of OSB, your email says 40. I put 40 on the draft, because the framer is the one who hangs it, and flagged it so it cannot load by accident. If 30 is right, it comes off.

The hangers are on this ticket. Delivery is Wednesday, one to three, to the lot and not the shop.

Prices are the ones on your account and nothing has been pulled. If a contract price changed last week, I will take the draft down rather than ship a number you did not approve.

Keeler Lumber & Supply · orders@keeler-lumber.example

You're getting this because you wrote to orders@keeler-lumber.example.

How it works

  1. The PO arrives.

    A PDF from the builder, a photo of a supply list, a spreadsheet from the estimator, or three lines typed into the message. Carbon paper from under the counter gets typed too.

  2. The shorthand becomes a Keeler item.

    Two by ten, sixteen foot, SYP is a description, not a SKU. The draft carries the item your yard stocks, from the branch the job pulls.

  3. Stock, price and delivery get looked up.

    What is on the ground this morning, what that builder pays, and whether it is picked up or delivered.

  4. The draft is waiting at the counter.

    Lines matched, shortages named, the one or two that need a person marked. Nobody types the order twice, and nobody hunts for lot nine.

What gets checked on every PO

A wrong line on a lumber ticket is a crew standing still and a truck coming back.

  • What each line means at this yard, not what the builder called it.
  • Stock at the branch the job pulls from, and what the other yard can send.
  • The account price, including any contract price for that builder.
  • The job name and phase, so the ticket lands on the right job.
  • Delivery or will-call, the gate time, and whether the truck is booked.
  • A line that changed between the PDF and the email.

Frequently asked questions

Does somebody still have to check the order?

Yes, and the check is the point. Your counter reads the draft, cuts what is wrong and releases it. What goes away is the typing, not the judgement.

Will it send a price my counter has not approved?

No. The draft uses the account price and stops there. A line with no price, or a contract price that ran out, comes to you as a question before anything moves.

Can it read a photo of a clipboard?

Yes, if the writing is legible. A lot of POs start on a clipboard in a truck cab.

What if the PO is a spreadsheet?

Excel and CSV come through line by line, in the builder's own column names, five files at a time.

Does it replace my order desk?

No. It takes the typing. The counter still knows which builder pays late, which crew sends the truck back, and which lot has a narrow gate.

What if the email and the PO disagree?

The draft follows the PO and names the difference in the body, because a sentence in an email is not a change order.

Related pages

Send us one Monday of orders@

We will draft that morning's POs and show you the lines your counter would have had to re-type. A PO for a closed job, or a builder with no account, goes to your team.

Talk to us about your inbox

A monthly fee per address plus usage, agreed with you. Your customers and suppliers keep emailing the address they already have.