For building supply yards · Contractor POs
Four contractor POs before eight, and the counter has not started yet. The typing is what eats the first shift, so the typing is what comes off the desk.
It is 6:20 on a Monday and the pot has not finished pulling. Four contractor POs are already in orders@: a PDF from a builder's office, a photo of a clipboard on a tailgate, a spreadsheet with eighty lines, and one that says same as lot nine, plus twelve sheets of OSB, and expects the counter to remember lot nine.
Your counter can read all four before the gate opens, because it knows the jobs, the builders and what is on the ground at each branch. Reading is not the work. Typing it in is, and in framing season that typing is three hours before the first contractor gets helped. People do not get replaced here, they get buried under it.
emaillme does the typing. Every PO comes back as a draft order: lines matched to what Keeler stocks, branch stock beside each line, the account price on it, delivery or will-call marked. Your counter reads it, fixes what is wrong, releases it.
Fictional building supply yard and customer. Addresses use .example.
Attached is PO 4471 for lot 12. Framing starts Thursday, so we need it on the ground Wednesday afternoon if you can.
Two changes from the copy the office sent. The OSB is 40 sheets and not 30, the framer changed the layout. And put the hangers on the same ticket this time. Last load they came a day late and the crew stood around.
Sending this from the truck, so call the office if the rest is a problem.
Marisol
Attachment: PO-4471.pdf (212 KB)
The same thread, answered. Every figure comes from the email and the paperwork behind it.
Marisol, PO 4471 is drafted for Wednesday afternoon at lot 12. Here is how the lines came out:
| Asked for | Keeler item | Branch 2 stock | Note |
|---|---|---|---|
| 2x10 16 SYP, 60 | 2x10x16 #2 SYP | 148 pcs | contract price |
| 7/16 OSB, 40 | 7/16 OSB sheathing 4x8 | 96 sheets | PDF says 30 |
| 2x10 hangers, 24 | LUS210Z joist hanger | 60 | same ticket |
| 16d nails, 2 boxes | 16d framing nail, 50 lb | 31 boxes | quoted price |
One line needs your word. The PDF says 30 sheets of OSB, your email says 40. I put 40 on the draft, because the framer is the one who hangs it, and flagged it so it cannot load by accident. If 30 is right, it comes off.
The hangers are on this ticket. Delivery is Wednesday, one to three, to the lot and not the shop.
Prices are the ones on your account and nothing has been pulled. If a contract price changed last week, I will take the draft down rather than ship a number you did not approve.
A PDF from the builder, a photo of a supply list, a spreadsheet from the estimator, or three lines typed into the message. Carbon paper from under the counter gets typed too.
Two by ten, sixteen foot, SYP is a description, not a SKU. The draft carries the item your yard stocks, from the branch the job pulls.
What is on the ground this morning, what that builder pays, and whether it is picked up or delivered.
Lines matched, shortages named, the one or two that need a person marked. Nobody types the order twice, and nobody hunts for lot nine.
A wrong line on a lumber ticket is a crew standing still and a truck coming back.
Yes, and the check is the point. Your counter reads the draft, cuts what is wrong and releases it. What goes away is the typing, not the judgement.
No. The draft uses the account price and stops there. A line with no price, or a contract price that ran out, comes to you as a question before anything moves.
Yes, if the writing is legible. A lot of POs start on a clipboard in a truck cab.
Excel and CSV come through line by line, in the builder's own column names, five files at a time.
No. It takes the typing. The counter still knows which builder pays late, which crew sends the truck back, and which lot has a narrow gate.
The draft follows the PO and names the difference in the body, because a sentence in an email is not a change order.
We will draft that morning's POs and show you the lines your counter would have had to re-type. A PO for a closed job, or a builder with no account, goes to your team.
A monthly fee per address plus usage, agreed with you. Your customers and suppliers keep emailing the address they already have.