For building supply yards · Takeoffs and bids
A takeoff written in the builder's words is a quote waiting to be built. Your desk checks the number instead of typing the list first.
A deck builder sends a takeoff for fourteen units: his own descriptions, his own quantities, an allowance for waste he filled in himself, and a note that half of it is for a job he is bidding on Friday. He wants a number before then, and the same spreadsheet has already gone to two other yards.
Somebody at your desk has to turn that into Keeler items, find the price break the whole order earns, add delivery, and get it back while he is still pricing. If it comes back Monday he has bought somewhere else. That quote lost on the clock, not on price, and it is the fourth one this week.
emaillme reads the takeoff, matches the lines to what you stock, applies your prices and breaks, and has a draft quote in the thread the same afternoon. Your estimator checks the assumptions, changes what needs changing, and sends it. He is not typing fourteen decks of material into a quote form at seven at night.
Fictional building supply yard and customer. Addresses use .example.
Spreadsheet attached for fourteen decks at Harlow Ridge. Composite on eleven, PT on three, all 12x16 with a 6 foot step.
I put a waste allowance in because the last yard shorted me on the fascia and I ate the second trip. Freight to the site, forty minutes out, no forklift.
If you can hold the composite price I will bring you the next two phases as well. I need the number by Friday lunch.
Attachment: Harlow-Ridge-takeoff.xlsx (64 KB)
The same thread, answered. Every figure comes from the email and the paperwork behind it.
Trent, Harlow Ridge is priced off your takeoff, all at the fourteen deck break, which is the better column for you:
| Takeoff line | Keeler item | Quantity | Note |
|---|---|---|---|
| 5/4x6 composite, 12 ft | TimberTech edge, grooved | 1,120 ln ft | 11 decks |
| PT 2x8x16 | 2x8x16 #2 SYP | 336 pcs | 3 decks |
| Hidden fasteners | Stainless clip, 900 ct | 12 boxes | one per deck |
| Fascia, 12 ft | Composite fascia, white | 168 pcs | waste included |
| Freight | Flatbed, 40 miles | 6 drops | no forklift |
Two assumptions, both at the top of the quote. Your waste allowance is kept exactly as you wrote it, which is what puts the fascia at 168. If your crew cuts tighter, the number comes down.
The composite price holds thirty days at this quantity. It is a mill price and it follows the mill, so thirty days is the longest I can stand behind.
Six drops, because fourteen decks will not ride one flatbed. Put the framer on three at the clubhouse and freight comes down by about $180.
This is a draft for your estimator to release, with both assumptions above the total. Nothing leaves this yard on a price nobody in the office has looked at.
A spreadsheet, a PDF with a material list, or a photo of a page with quantities in the margin.
A deck builder's line for composite fascia is not your item number until somebody says which one he means.
The break the whole order earns, the delivery for that address, and the waste allowance he asked for.
Drafted, assumptions named at the top, sitting in the thread for your estimator to release.
A quote is a promise about price and stock, and both get looked at before it leaves.
Yes. Builders describe material their own way, and the draft says what each line became, so a wrong match shows up before the quote goes out.
Your estimator. The draft sits in the thread with the assumptions on top, and nothing goes out until he releases it. A price nobody in the office has seen is not a price we send.
It states how long the price holds, using your terms. On mill-priced goods that is usually thirty days, and the quote says so.
The latest gets quoted and the earlier ones are noted in the thread, so nobody prices a revision that was replaced.
Delivery is its own line, with drops and access on it. Tax follows your rules for the job address, often a different county.
No. It does the typing and the lookups. Your estimator still decides what is worth chasing, how much waste to carry, and when a price is too thin.
We will quote them off your price list and you can mark what your estimator would have changed. A takeoff for something you do not stock comes back as a question.
A monthly fee per address plus usage, agreed with you. Your customers and suppliers keep emailing the address they already have.