For job shops · Ship dates
The customer asks whether the date holds, and the answer has to be right. What comes back is the status from the job, with anything that would move the date handed to your planner.
It is ten past four on a Thursday. The planner is in the router looking for the induction date on the pivot pins when the phone rings, and the email that started it is already four messages deep in a thread about that same date.
The customer is asking one thing, whether the parts are on the dock on the nineteenth, and answering it means three tabs: the router, the processor's last email and the inspection queue. Twenty minutes for a question with a one line answer. Ten of those a day is half a planner, and half a planner is a hire nobody budgeted for.
We read the job, the router and the processor's promise and answer with the date that matters, including the day it was last confirmed. When a date is going to move, the customer hears it from the shop with the reason and a new date.
Fictional job shop and customer. Addresses use .example.
We are scheduling the line for the twenty second and the pins are the long pole. Are they still shipping on the nineteenth?
If they are going to slip I need it this week. I cannot move a line on the morning of.
The same thread, answered. Every figure comes from the email and the paperwork behind it.
Grant, not the nineteenth. Here is where the job actually is:
| Step | Status | Date | Note |
|---|---|---|---|
| Machining | complete | last week | 250 pcs |
| Induction, groove | at processor | back the twelfth | was the fifth |
| Final inspection | queued | the sixteenth | first article done |
| Ship | moved | the twenty second | was the nineteenth |
The pins are machined and sitting at the induction processor. They were due back on the fifth and now it is the twelfth, because their line was down a day and a half. Inspection was already booked for the sixteenth, so shipping moves from the nineteenth to the twenty second.
That is the day after your line date. Overnight on the twenty second puts them in your door on the twenty third, and the freight is the one thing here I cannot decide for you.
The other option is a split. Two hundred pieces can be finished and shipped on the sixteenth, with the balance going on the twenty second. Your line gets most of what it needs and we carry the rest.
If the processor slips again you will hear it from me the same day. The twelfth is their number as of Tuesday and I have not made it sound better than it is.
About a ship date, a first article, a partial, or a job that has gone quiet for a fortnight.
The operation it is genuinely at, the outside promise, and the date inspection can take it.
Ship or arrival, why it moved, and the option that protects the customer's line.
Before the customer's own schedule finds it, with the new date in the first line of the reply.
A date that has not been confirmed with the processor is a guess with a commitment attached to it.
No. It repeats the date the shop and the processor have given and says when that was last confirmed. Where a date is soft it says so, which is why the reply names a Tuesday.
He does, and he should. The draft is the twenty minutes of looking done before he opens it. He reads the date against the floor and sends it.
It checks what is finished and offers the split with two dates, so the customer decides what his line can live with.
It reports where the material is and when the job is scheduled to start, which is usually the honest answer three weeks out.
It can say what an expedite costs in freight or in the schedule. Whether to spend it is a commercial call, and it stays with you.
Yes, early, with the reason and the new date. That is the whole job, and it is the first thing a busy planner runs out of time for.
We will answer the date questions from your router and you can hold them against the floor. The customer who wants to change the order goes to your team.
A monthly fee per address plus usage, agreed with you. Your customers and suppliers keep emailing the address they already have.