For job shops · RFQs and estimating

From RFQ to a priced draft, without the retyping

A print, a quantity and a date, and forty minutes of reading before anyone can price it. Your estimator still sets the number.

It is twenty to seven and the estimator has a print, a red pen and an empty quote sheet in front of him. The RFQ came in at ten last night with June on it: two diameters, a groove and a cross hole, and a line at the bottom asking whether this shop can hold the width.

Re-typing the print into the sheet is forty minutes if nothing is missing, and then come the mill lead time, the processor's two weeks and the last job in that family. One shop owner put his own number on it: 60% of the time was wasted retyping what was already in an email or PDF. Two of those before lunch and the day is gone.

We read the RFQ and the print, pull the tolerances, find the closest jobs in that family, and put material and outside cost on a sheet with the questions at the top. Your estimator still sets the price, from a filled sheet.

The RFQ, as it arrived

Fictional job shop and customer. Addresses use .example.

From
Grant Whitlock <grant@northfield-ag.example>
To
Alder Machine Works <quotes@alder-machine.example>
Subject
RFQ, pivot pin, 500 pcs, need by June

Print attached, rev C. 4140 pre-hard, 250 pieces now and 250 in the fall off the same print. Two diameters, a groove and a cross hole, nothing exotic.

The 55 Rockwell is in the groove area only, so it wants induction and not through hardening. We have been buying these out of Ohio at four weeks and we want a second source nearer home.

Can you hold the groove width? The last shop said they could, and then did not.

Attachment: NFA-2214-rev-C.pdf (340 KB)

The priced draft the estimator sent

The same thread, answered. Every figure comes from the email and the paperwork behind it.

From
Alder Machine Works <quotes@alder-machine.example>
To
Grant Whitlock <grant@northfield-ag.example>
Subject
Re: RFQ, pivot pin, 500 pcs, need by June

Grant, here it is at 250 and at 500. The print leaves two things open and I have priced around both:

Item250 pcs500 pcsNote
4140 pre-hard barquotedquotedmill lead time
Turning and millingquotedquotedone setup
Induction, groove onlyoutsideoutsidetwo weeks
First articleincludedincludedreport with the lot

We can hold the width. The last shop most likely finished it after induction, and 55 Rockwell in that band moves the groove as it comes out of the coil. We cut it before and leave the allowance.

Two things need you before this is firm. The print is rev C with no revision letter, so I do not know what changed from rev B. And induction is two weeks at our processor, so June works only if the order lands by mid May.

This sheet is my draft. The price on it is the shop's, and the risk call on that groove is his to confirm.

Alder Machine Works · quotes@alder-machine.example

You're getting this because you wrote to quotes@alder-machine.example.

How it works

  1. The RFQ lands at quotes@.

    A print, a quantity, a date, and often the name of the shop that quoted it last and missed.

  2. The print is read for what costs money.

    The tolerances that decide the setup, the hardness, the finish, and the operations sent out.

  3. The last similar job gets found.

    What that family of part took, what the setup really cost, and which mill price it was bought at.

  4. A filled sheet goes to the estimator.

    Material and outside cost in, the open questions at the top, the price still his to set.

What gets checked on an RFQ

A quote is a promise about a tolerance and a date, and both are cheap to make and expensive to break.

  • The revision on the print, and whether anybody sent a letter saying what changed.
  • The tolerances, and whether this shop holds them on a Thursday afternoon and not only on a good day.
  • Material grade and condition, and what the mill wants at that quantity.
  • The outside operations, their lead time, and whether their furnace holds the hardness.
  • The quantity breaks, and whether the second release is a blanket or a fresh order.
  • The date the customer needs against the processor's two weeks and the shop calendar.

Frequently asked questions

Does the estimator still set the price?

Every time. The sheet arrives with material, time and outside cost filled in and the questions named. He changes what he disagrees with, and it stays a draft until he has.

Am I still reading the print?

You read the two lines that matter: the tolerance that decides the operation and the date that decides the answer. Neither is decided for you.

What if the print has no revision letter?

That becomes a question on the quote instead of an assumption inside it. It is the cheapest way to find out you have been quoting rev C.

Can it quote a blanket order?

It prices the releases as releases and says where the material risk sits, because a blanket holds a price and not a mill cost.

Is a machine pricing my parts?

No. It does the reading and the arithmetic on work this shop has already run. Holding a groove at 55 Rockwell stays with the man who has held one.

Who actually sends the quote?

Your estimator or your salesperson, from your address, after they have put their name on the number.

Related pages

Send three RFQs you quoted last month

We will build the sheets and you can mark where the estimator's judgment would have moved the number. The print nobody can read goes to your team.

Talk to us about your inbox

A monthly fee per address plus usage, agreed with you. Your customers and suppliers keep emailing the address they already have.