For industrial parts · Cross-referenced POs

Cross-reference first, order second

Every line is a part number that may or may not be yours. Fifteen years of crossing numbers is what makes the match, and it should not live in one person's head.

Tuesday, 6:40, and Dale Ferris has sent the shutdown list. Thirty eight lines for a two day stop, and about half came off a machine manual or off the part he took out, which makes half of them somebody else's numbers.

At the counter that is not a problem. Whoever is on it has crossed those numbers for years and knows that a 6205 on this plant's conveyor means the sealed one, not the open one. The trouble is that he is also serving a customer, and the cross is four or five minutes a line, and the shutdown is Thursday.

emaillme crosses every line against your reference and against what that account bought last time, then drafts the order with the match next to the number Dale sent. A line that crosses to two parts, or to none, comes back as a question. Your counter overrides what he wants, and sends it.

The shutdown list, as it landed

Fictional parts supplier and customer. Addresses use .example.

From
Dale Ferris <maintenance@twin-oaks-mill.example>
To
Ardmore Bearing & Supply <orders@ardmore-bearing.example>
Subject
Shutdown list, need it all Thursday

List for the shutdown Thursday. Mostly the same as last year, but the conveyor is eating bearings so I put six of those on.

The seal number I have is out of the old book, it might be superseded. Use whatever you sent last time if it is the same one.

We are down for two days only, so if something is not on the shelf tell me today and I will find it elsewhere.

Attachment: shutdown-list.xlsx (38 KB)

The draft that came back

The same thread, answered. Every figure comes from the email and the paperwork behind it.

From
Ardmore Bearing & Supply <orders@ardmore-bearing.example>
To
Dale Ferris <maintenance@twin-oaks-mill.example>
Subject
Re: Shutdown list, need it all Thursday

Dale, the list is crossed and the draft is built. Two lines want your word before Thursday:

Your numberArdmore partQtyNote
6205-2RS (SKF)6205-2RS, NTN6both branches
CR 12345 sealCR 12345-A, nitrile4needs your yes
60 chain, 10 ft60-1 chain, cut20 ftcut to order
Sprocket 60B1860B18, 1 in bore2one here, one Charlotte

The six bearings are the ones you had last time, sealed both sides, and there are plenty. If the conveyor eats them that fast, the sprocket is why.

The seal needs you. Your book number crosses to 12345-A, which is what we sent last time, so it is on the draft. It is a supersession and not the identical part, and that is yours to say.

The sprocket is the only line that misses Thursday. One is on the shelf here, the second has to come up from Charlotte, and that is a day. Both are on the draft, Friday against the second.

The chain is cut off the reel and it does not come back once it is cut. If twenty feet is wrong, say so before Wednesday.

Ardmore Bearing & Supply · orders@ardmore-bearing.example

You're getting this because you wrote to orders@ardmore-bearing.example.

How it works

  1. The list arrives at orders@.

    A planner's spreadsheet, a photo of the old part, or twenty lines typed into the body with numbers from three different makers.

  2. Every number gets crossed, and the cross is on the line.

    Against the reference you keep and what that account bought last time. The draft names the part and where the cross came from.

  3. Anything unclear turns into a question.

    Two possible seals, no cross, a number that stopped existing in 2019. Those come back as options, not as a guess on the pick ticket.

  4. Stock is read branch by branch.

    What is here, what is in Charlotte, and the day each can make, so a two day shutdown sits against something real.

What gets looked at on a crossed order

A bearing that is nearly right runs for a week and then does not.

  • The number he sent against your reference, with the match named in the line.
  • Sealed, shielded or open. Same size, different part, and the machine knows.
  • What that account bought the last time, since that is usually the part he means.
  • A supersession, a new number on a part that is not quite the old one.
  • Shelf stock by branch, and the day each branch can put it on a truck.
  • Cut chain and hose, sold by the foot and gone once the reel is open.

Frequently asked questions

Does somebody still have to check the number?

Yes, and the counter is the one who should. The draft shows the part it picked next to the number that came in, so the check is a glance instead of an afternoon of crossing.

Does this replace the man at the counter?

No. He says yes on a supersession, a seal material, anything odd. What goes away is the re-typing of a list that already exists on paper, forty minutes of it, while a customer waits.

Can it cross another maker's number?

Through the reference you already keep. Where there is no cross it asks, because a guess on a bearing is a machine down in a fortnight.

What happens to a number it does not know?

It goes to your counter with the manual page or the photo, and stays off the pick until a person has chosen.

How does it know what Dale bought last year?

From the account history on that part. On a shutdown list, last year's order is a better guide than the old book.

Who sends the order?

Your counter, out of orders@. The draft waits until he sends it, and a line that would have been missed is already a question on it.

Related pages

Send us one shutdown list

We will cross every line and send back the draft with the ones that needed a person marked. Nothing goes out until your counter has read it.

Talk to us about your inbox

A monthly fee per address plus usage, agreed with you. Your customers and suppliers keep emailing the address they already have.