For industrial parts · RFQs from a part number

They send a part number. You send a quote.

They send a part number that is not yours, and the price lives in the counter's head. The reading and the lookup happen first, so the quote takes minutes.

Wednesday, ten past eight, and four RFQs are in quotes@ before the counter has opened. One of them is eight of something, with a page out of a gearbox manual attached and the words best price and lead time under it.

The pricing lives entirely in his head. Not because he is guarding it, but because fifteen years of quoting the same families of bearings put it there, and he can put a number on a 22216 E before he puts his coffee down. What he cannot do is answer four of them while a customer stands at the counter holding a pump that has stopped.

emaillme crosses the OEM number, reads the shelf and the cost at each branch, and drafts the quote with both brands and both dates on it. The number comes from the price file and the last price you gave that account. Your counter cross-checks it against what he would have said, moves it if he would have, and sends it.

The RFQ, as it came in

Fictional parts supplier and customer. Addresses use .example.

From
Renata Silva <purchasing@northgate-food.example>
To
Ardmore Bearing & Supply <quotes@ardmore-bearing.example>
Subject
Best price and lead time, 8 pcs

We need eight of the attached. It is the gearbox output bearing on a filler, and the number is from the OEM manual.

Last time we bought these they were SKF and took three weeks. If you can do better on lead time we will take eight now and eight on the next shutdown.

Attachment: gearbox-page.pdf (180 KB)

The quote that came back

The same thread, answered. Every figure comes from the email and the paperwork behind it.

From
Ardmore Bearing & Supply <quotes@ardmore-bearing.example>
To
Renata Silva <purchasing@northgate-food.example>
Subject
Re: Best price and lead time, 8 pcs

Renata, your OEM number crosses to a catalogue bearing, so there is more than one way to get you eight:

ItemBrandQtyLead time
22216 E, sphericalSKF8Charlotte, Thursday
22216 E, sphericalNTN8Ardmore, tomorrow
Adapter sleeveSKF8with the SKF order

The OEM number is a 22216 E, a catalogue bearing and not a special. That is why the three weeks last time was stock and not factory.

SKF is in Charlotte and can be with you Thursday. The NTN is on the shelf here and can go tomorrow. Same envelope, same C3 clearance the filler wants, so the choice is the date and the name on the box.

Eight now and eight at the shutdown comes in under eight at a time, because the second eight ride the same order. I have quoted it that way and put the second release on hold rather than on a promise.

The number is priced off what we gave you in November and the file the counter keeps. He signs it before it goes out, so if he would have gone in lower you will see that before you order.

Ardmore Bearing & Supply · quotes@ardmore-bearing.example

You're getting this because you wrote to quotes@ardmore-bearing.example.

How it works

  1. The RFQ comes into quotes@.

    A number, a quantity, a date, and often a photograph of a manual page instead of a clean part number.

  2. The number is crossed to something you stock.

    The OEM number and the catalogue part side by side, so the buyer sees what he is actually being quoted.

  3. Shelf and cost are read branch by branch.

    What is here today, what Charlotte can send, and the factory date where neither of them has it.

  4. The price is set from the file and not from the air.

    The last price on that account, the break above it, both brands and both dates, so the buyer picks on what decides it for him.

What gets checked on a quote for one part number

Fitting is not the same as right. Clearance and seal material are where a cheap bearing gets expensive.

  • The OEM or competitor number against a real part, with the cross in the draft.
  • Clearance, seal type and bore, the three callouts that go missing on a quote taken over the phone.
  • Shelf stock at each branch and the day that branch can make.
  • The price at the quantity asked for, and at the break above it.
  • Whether he wants a brand, or a part that works in that application.
  • A second release before a shutdown, priced as one order instead of two.

Frequently asked questions

Does the counter still set the price?

On anything that is not already in the file, yes. The draft uses the last price on that account and the break above it, and he can move it before it leaves quotes@.

So the pricing is still in his head?

Less of it each week. What he quoted last time is written down where the next quote can reach it. Anything new still goes to him, and it should.

Can it cross an OEM number?

Through the reference you keep. The manual page the buyer sent stays on the draft, so the callouts can be read against the part being offered.

What if the number is obsolete?

The reply says so and offers what replaced it, instead of quoting a part nobody has been able to supply since 2019.

Will it quote a cheaper brand?

Only where it is the same bearing, with the difference named in the reply. A cheaper one with the wrong clearance is not a saving, it is a second order.

Who sends the quote?

Your counter, out of quotes@. The draft sits in the thread with the cross and the dates, and it goes when the number is one he is happy to stand behind.

Related pages

Send us a week from quotes@

We will cross the numbers and draft the answers off your own price file, and you can mark them against what you would have said. The one that needs an engineer's eye goes to your team.

Talk to us about your inbox

A monthly fee per address plus usage, agreed with you. Your customers and suppliers keep emailing the address they already have.