For wholesale distributors · RFQs

The RFQ is read before the rep opens it

The rep is the one who knows what to charge. The reading, the item matching and the chasing are the hours around that, and those are the hours this gives back.

Ten past seven on a Tuesday, and quotes@ has a fixture schedule from a contractor bidding a two hundred unit apartment job. Two hundred and fourteen lines, a sixty day price hold asked for, and a bid due Friday.

None of it is your part numbers. Somebody reads it line by line, crosses it to stock, looks up cost, and calls the factory about the one item nobody carries. Three days later the quote goes out. Quoting is fine at five customers a week. At twenty it eats the week.

Anyone can quote fast. Nothing chases the quote after it goes quiet, and the one that went quiet on Thursday is the one you needed. emaillme reads the schedule, prices every line it can, and leaves the draft in the thread with the exceptions at the top. Your rep prices those and sends it Tuesday, and a nudge is drafted when the contractor goes quiet.

The schedule, as it landed

Fictional distributor and customer. Addresses use .example.

From
Priya Raman <estimating@bellhaven-mechanical.example>
To
Ridgeway Supply <quotes@ridgeway-supply.example>
Subject
Cedar Mill apartments, fixture schedule, price hold

Schedule attached for Cedar Mill, four buildings, two hundred units. We bid Friday and I need your number Thursday.

Two things. The roof carrier package is a factory item on our spec, so give me a lead time you can actually hold. And the price needs to hold sixty days, the award is not until March.

Do both and you are on the next phase as well.

Attachment: Cedar-Mill-schedule.xlsx (96 KB)

What the rep sent back

The same thread, answered. Every figure comes from the email and the paperwork behind it.

From
Ridgeway Supply <quotes@ridgeway-supply.example>
To
Priya Raman <estimating@bellhaven-mechanical.example>
Subject
Re: Cedar Mill apartments, fixture schedule, price hold

Priya, the schedule is priced. Two hundred and fourteen lines, and four need your OK before this is a firm number:

Schedule itemOur itemLinesNote
Lav supply, 1/2 inPEX crimp stub, 1/2108stock, 45 day hold
Water closet, ADACadet Pro, elongated62white, spec says biscuit
Roof carrier packagefactory item430 day lead, factory
Floor drain, 3 incast iron, nickel40special order, no return

The lav supplies and floor drains hold sixty days at these prices. The carrier packages are factory and the factory holds thirty, so that is what the quote says. If you need sixty I will ask, but I will not say yes before I hear back.

One line does not match the spec. Twenty two water closets are called out biscuit and I priced white, because white is what is on the shelf. Nine dollars a unit, and your call, so it stays flagged.

The floor drains are special order and non-returnable once they ship. That is in plain words on the quote, not the fine print, so nobody is surprised in April.

This is the draft. Your rep releases it, and he will call you about the biscuit line before it goes.

Ridgeway Supply · quotes@ridgeway-supply.example

You're getting this because you wrote to quotes@ridgeway-supply.example.

How it works

  1. The schedule hits quotes@.

    A spreadsheet, a spec sheet, a photo of a takeoff, or six lines in the body of an email.

  2. Every line gets read against your stock.

    Their description and their number, crossed to an item you carry, at a cost you can stand behind.

  3. The exceptions come to the top.

    The factory item, the discontinued model, the line with no cost, and the color that does not match the spec.

  4. The rep prices and sends.

    Two hundred lines of typing turns into twenty minutes of pricing, in the thread it arrived in.

What gets looked at before a quote leaves

On a long schedule the expensive mistakes are small: a line that crossed to something close, and a price hold nobody wrote down.

  • Each schedule line against a real item you stock, with any substitution named, not assumed.
  • Cost and sell price, and whether the factory price holds for the whole sixty days.
  • The unit it is sold in, cases against pieces, where a quantity goes wrong.
  • Special order and non-returnable lines, said out loud on the quote.
  • Lead times on anything not on the branch floor this morning.
  • The hold the customer asked for, on the quote and not only in the email.

Frequently asked questions

Can it quote from another supplier's part numbers?

It crosses a number to something you stock and shows the cross, so the rep can throw it out. No cross, no guess.

Who sets the price on a bid job?

Your rep does. The draft carries cost on every line and a suggested sell, and the sell is a suggestion until somebody at your desk signs it. No price goes out unseen.

Do we still have to check the work?

Yes. The exceptions sit at the top so the check is four lines, not two hundred. What you are checking is the judgement, not the typing.

What happens when the quote goes quiet?

A nudge is drafted in the same thread on the interval you pick, with the quote attached and one line asking if the job went elsewhere.

Does it handle freight and job site delivery?

Freight is its own line, with the drop count and any lift gate charge named. It does not get folded into the unit price.

How is this different from the other quoting tools?

Most stop at the quote. The going quiet is what costs you the job, so the nudge is in from day one. We show it on a real schedule, not a slide.

Related pages

Send the last schedule you quoted

We will price it from your cost file and you mark every line the rep would have changed. A line nobody can identify goes to your team as a question.

Talk to us about your inbox

A monthly fee per address plus usage, agreed with you. Your customers and suppliers keep emailing the address they already have.